NEW CERC TIMETABLE
JUNE 2010
The second stage of Demolition begins at the front of the CERC.
SEPTEMBER 2010
The second stage of construction begins at the front of the building.
JUNE 2010
The second stage of Demolition begins at the front of the CERC.
SEPTEMBER 2010
The second stage of construction begins at the front of the building.